
One candidate for a McKesson lead network systems engineer role described four interview rounds: a hiring manager screen, a team technical screen, an SVP of IT conversation, and a contractor-manager screen on tools and vendors.
$147K
Avg. Base Comp
$190K
Avg. Total Comp
The only detailed account we have is from one candidate who interviewed in late 2024 for a Lead Network System Engineer role, so treat it as one data point rather than a standard McKesson process. That candidate described four rounds: a hiring manager screen, a technical screen run by the engineers they would work with, a conversation with the SVP of IT, and a screen with a manager from TCS, a third-party contracting company.
The round that stood out was the last one. The role was framed as overseeing deployments and changes made by TCS engineers, and the candidate expected network fundamentals. Instead, most of that screen went to tools, switch models and vendor comparisons. If you are applying for a role with contractor oversight, be ready to compare platforms you have used and explain why you would choose one over another.
The technical screen, by contrast, was run by the future team, who the candidate said clearly knew the environment. Review the infrastructure that team manages and be ready to talk concretely about your own deployments and changes.
The candidate was not selected and heard nothing for about a month after the final round. They thought the role may not have been firmly open, but that was their own impression. Plan for a long process and be patient between rounds.
Synthesized from 1 candidate report by our editorial team.
Had an interview recently?
Share your experience. Unlock the full guide.
Real interview reports from people who went through the Mckesson process.
This was the longest hiring process I've been through, and it ended in a rejection that I still don't fully understand. I started in October 2024 with a screen from the hiring manager, who asked thoughtful, relevant questions and made the conversation easy to get through. The second round in November was a technical screen run by the engineers I would actually be working with, and I felt that went well because they clearly knew the environment. A few weeks later I met the SVP of IT, who was very friendly and asked insightful questions.
The role was framed as supervising and managing the deployments and changes made by engineers from TCS, a third-party contracting company. That made the fourth round, a December screen with the TCS manager, the one that stuck with me. I expected it to focus on network fundamentals, but most of the time went to tools, switch models, and vendor comparisons. Those questions felt more like what you'd ask a Sales Engineer than someone overseeing a contractor's work. Since my future team had already approved my technical skills, I came away suspecting the TCS manager was mostly gauging how strong a candidate I was, possibly because a capable in-house hire could eventually reduce reliance on the contractor. That's my own speculation, not something anyone told me.
After the final round I heard nothing for about a month. The result arrived around January 19, 2025, and I was not selected. My impression was that the company had been exploring the idea of this role without a firm position ready to fill.
Prep tip from this candidate
Be ready for vendor, tooling, and switch-model comparison questions even if the role is framed as oversight of a contractor, since the TCS-side screen leaned heavily on those topics rather than core networking fundamentals. Also expect the technical screen to be run by the team you'd join, so review the specific infrastructure they manage.
Share your own interview experience to unlock all reports, or subscribe for full access.
Sourced from candidate reports and verified by our team.
Topics based on recent interview experiences.
Featured question at Mckesson
How would you answer when an interviewer asks why you applied to their company?
Synthesized from candidate reports. Individual experiences may vary.
The candidate reports the process began with a screen from the hiring manager in October 2024. They describe the questions as thoughtful and relevant to the role, and the conversation as easy to get through. The account does not list specific questions, so this is one person's impression of the tone.
In November, the candidate reports a technical screen run by the engineers they would work alongside. They felt it went well because those interviewers clearly knew the environment. Candidates may want to review the infrastructure the hiring team manages and prepare concrete examples from their own network work.
A few weeks after the technical screen, the candidate met the SVP of IT, whom they describe as very friendly and as asking insightful questions. The account gives no further detail on the topics, so prepare as you would for a senior stakeholder conversation about your experience and judgment.
The role involved overseeing changes made by engineers from TCS, a third-party contractor. The candidate expected fundamentals but reports most of this screen covered tools, switch models and vendor comparisons. They then waited about a month and were told around January 19, 2025 that they were not selected.